Aerial view of paving crew working at night under LED light bars, fresh asphalt gleaming obsidian-black
Asphalt Paving Specialists

Every Square
Yard.
Documented.

GPS-guided pavers. Calibrated screeds. Compaction logs on every lift. Municipal roads, distribution lots, and private drives — built to spec, delivered on date.

2.4M+

Square Yards Paved

340°F

Mat Temp Tolerance ±5°

97%

On-Date Delivery Rate

18 yr

Average Crew Experience

Scroll
Hot-Mix Asphalt
GPS-Guided Pavers
Compaction Logging
NAPA Certified
Municipal Contracts
Milling & Resurfacing
ADA Compliance
Infrared Repair
Hot-Mix Asphalt
GPS-Guided Pavers
Compaction Logging
NAPA Certified
Municipal Contracts
Milling & Resurfacing
ADA Compliance
Infrared Repair
Crew Profile 01
Male construction foreman in hard hat and high-visibility vest reading grade stakes at a paving job site in hard afternoon light

Marcus Delgado

Lead Foreman

22

Years On Site

"I've been reading grade stakes since before GPS existed. Now I run both. You get the machine precision and the field instinct — that's why our tolerances are tighter."

NAPA Level IIIAPWA CertifiedOSHA 30-HourGPS Grade Control

Material Temperature Standards.

Side-by-side against APWA standard specification

Metric
Pave Standard
Industry Avg.
Mat Temp at Screed
325–345°F
270–340°F
Temp Deviation Tolerance
±8°F
±25°F
Mix Design Verification
Every Load
Per Shift
Grade Stake Accuracy
±0.01 ft
±0.05 ft
Pre-Pour Moisture Check
Required
Optional
Documented Temp Log
Every Lift
Not Standard

Why It Matters

Temperature discipline at the screed determines long-term bond strength. Every 10°F deviation below spec cuts mat life by up to 18 months.

Crew Profile 02
Female construction worker in hard hat checking pavement depth with a gauge at an asphalt paving site

Diane Kowalczyk

Screed Operator

16

Years On Site

"The screed is where the road is made. I check depth every 50 feet — not because the spec says to, but because that's how you catch a bad section before it's under the roller."

Caterpillar Screed CertifiedACI Field TechNAPA Level II

Compaction Density & Warranty.

Side-by-side against APWA standard specification

Metric
Pave Standard
Industry Avg.
Compaction Passes (Base)
8–10 passes
4–6 passes
Target Density
96% Marshall
92% Marshall
Nuclear Gauge Tests
Every 500 SY
Every 2,000 SY
Edge Compaction
Dedicated Pass
Included in Main
Lift Thickness Tolerance
±3/16 in
±1/2 in
Surface Warranty Term
5 Years
1–2 Years

Why It Matters

Compaction density above 95% Marshall eliminates future rutting under heavy truck traffic. Fewer passes means lower density — and shorter pavement life.

Selected Projects

The Work
Speaks.

Every project delivered with GPS accuracy logs, compaction reports, and photographic documentation at each lift.

Freshly paved county road stretching into the horizon at dusk, lanes laser-straight

48,200 SY

County Road 14 Resurfacing

Jefferson County DOT · 2025

Large commercial parking lot freshly paved with bright white lane markings

112,000 SY

Meridian Distribution Center

Meridian Logistics LLC · 2025

Paving crew operating asphalt paver at industrial park job site at dawn

31,400 SY

Northgate Industrial Park

Vertex Construction GC · 2024

Aerial view of mall parking lot resurfacing project mid-completion

67,800 SY

Westfield Mall Lot Rehab

Westfield Property Group · 2024

Highway milling machine removing old asphalt surface on state route

89,500 SY

State Route 88 Mill & Fill

ODOT District 4 · 2026

127

Projects Completed

2.4M

Square Yards Paved

14

State Contracts

100%

Passed Final Inspection

Primary CTA

Schedule a
Site Walk.

Our foreman walks your site, reads existing grades, and hands you a written spec — not an estimate — within 48 hours.

25K SY
500 SY200K SY

Download Our Spec Sheet

Full material specs, mix design details, compaction standards, and warranty terms.

Why Engineers Choose Pave

Written Spec, Not an Estimate

Every quote includes mix design, compaction targets, lift thickness, and warranty terms — signed.

GPS Accuracy on Every Pass

Topcon and Trimble-equipped pavers with 3D grade control. Deviation logs included in closeout package.

5-Year Surface Warranty

We stand behind our compaction density. If the mat fails within 5 years due to workmanship, we return.

On-Date or We Credit You

We've mobilized on the promised date 97% of the time over 8 years. Miss by a day, you get a discount.